Mantis Bugtracker
  

Viewing Issue Advanced Details Jump to Notes ] View Simple ] Issue History ] Print ]
ID Category Severity Reproducibility Date Submitted Last Update
0002106 [Resin] major always 10-23-07 10:56 10-01-07 09:02
Reporter rhodepc View Status public  
Assigned To ferg
Priority normal Resolution fixed Platform
Status closed   OS
Projection none   OS Version
ETA none Fixed in Version 3.1.4 Product Version 3.1.3
  Product Build
Summary 0002106: [Hessian] all calendar value is set to currrent date
Description I have a java class that contains a java.util.Calendar, whenever I send it over the wire with hessian, the java.util.Calendar get initialized with the current data. If I do not pass it through hessian, the original date value is preserved.
Steps To Reproduce
Additional Information
Attached Files

- Relationships

- Notes
(0002417)
ferg
10-01-07 09:02

hessian/{3a89,3bb4}
 

- Issue History
Date Modified Username Field Change
10-23-07 10:56 rhodepc New Issue
10-01-07 09:02 ferg Note Added: 0002417
10-01-07 09:02 ferg Assigned To  => ferg
10-01-07 09:02 ferg Status new => closed
10-01-07 09:02 ferg Resolution open => fixed
10-01-07 09:02 ferg Fixed in Version  => 3.1.4


Mantis 1.0.0rc3[^]
Copyright © 2000 - 2005 Mantis Group
29 total queries executed.
26 unique queries executed.
Powered by Mantis Bugtracker