|
Mantis - Resin
|
|||||
| Viewing Issue Advanced Details | |||||
|
|
|||||
| ID: | Category: | Severity: | Reproducibility: | Date Submitted: | Last Update: |
| 2106 | major | always | 10-23-07 10:56 | 10-31-07 09:02 | |
|
|
|||||
| Reporter: | rhodepc | Platform: | |||
| Assigned To: | ferg | OS: | |||
| Priority: | normal | OS Version: | |||
| Status: | closed | Product Version: | 3.1.3 | ||
| Product Build: | Resolution: | fixed | |||
| Projection: | none | ||||
| ETA: | none | Fixed in Version: | 3.1.4 | ||
|
|
|||||
| Summary: | 0002106: [Hessian] all calendar value is set to currrent date | ||||
| Description: | I have a java class that contains a java.util.Calendar, whenever I send it over the wire with hessian, the java.util.Calendar get initialized with the current data. If I do not pass it through hessian, the original date value is preserved. | ||||
| Steps To Reproduce: | |||||
| Additional Information: | |||||
| Relationships | |||||
| Attached Files: | |||||
| Notes | |||||
|
|
|||||
|
|
||||