Mantis - Resin
|
|||||
Viewing Issue Advanced Details | |||||
|
|||||
ID: | Category: | Severity: | Reproducibility: | Date Submitted: | Last Update: |
2106 | major | always | 10-23-07 10:56 | 10-31-07 09:02 | |
|
|||||
Reporter: | rhodepc | Platform: | |||
Assigned To: | ferg | OS: | |||
Priority: | normal | OS Version: | |||
Status: | closed | Product Version: | 3.1.3 | ||
Product Build: | Resolution: | fixed | |||
Projection: | none | ||||
ETA: | none | Fixed in Version: | 3.1.4 | ||
|
|||||
Summary: | 0002106: [Hessian] all calendar value is set to currrent date | ||||
Description: | I have a java class that contains a java.util.Calendar, whenever I send it over the wire with hessian, the java.util.Calendar get initialized with the current data. If I do not pass it through hessian, the original date value is preserved. | ||||
Steps To Reproduce: | |||||
Additional Information: | |||||
Relationships | |||||
Attached Files: |
Notes | |||||
|
|||||
|
|